AUGUST:
General stuff laid out so detail & concrete planning can start:
Bus found- Story outlined (main scenes selected & beats determined)
Monster designs chosen
Ongoing: previs, modeling/programming/rigging practice
SEPTEMBER:
Final preprod work done based on decisions made in August:
- Sofware choises made, pipeline outlined
- Tools required to start work
- Final character designs
- Final script
As everyone returns to Bournemouth:
4. Storyboards
5. Colour script
OCTOBER:
Shift from preproduction to production, start of modeling/rigging. Also important:
- Animatic (-> composer contact)
- Project pitches / showreels
--
LIVE ACTION SHOOT:
Exact date in November (once the pitch has been accepted) to be decided. It will probably go something like this:
Day 1:
Train to London.
Underground shoot.
Train to Bedford.
Day 2:
Bus shoot 1.
10-11: Camera/actor/monster placements determined, measurements made, set dressed (posters)
11-13.30: Actors arrive, filming.
13.30-14:00: Cleanup.
Cake.
Check footage for problems.
Day 3:
Bus shoot 2.
10:00-10:30: Setup.
10:30-13.30: Filming. (If Horny is SFX, this is the filming day for his scenes.)
13:30-14:00 Cleanup.
Cake.
Train to London.
After sundown: London exteriors shoot.
Train to Bournemouth.
--
As the preproduction gets done and stuff clears up, the rest of the schedule will slot into place.