Friday 25th October
Collect equipment after 10am
Shooting practice
Sunday 29th October
I'll drive up to Manchester with the costume, lights etc.
Monday 28th October
Caroline, Milena, Tomas
Bournemouth Coach Station to London Victoria Coach Station
07:15 - 10:20
Siobhan will meet you in London after 11:00.
Waiting for the permit but it should be as follows:
You will be able to shoot on the Underground between the hours of 10:00-15:30.
I'll post more information when it has been confirmed but you will need to report to the Station Supervisor, I specified Tottenham Court Road station.
Caroline, Milena, Siobhan, Tomas
London Victoria Coach Station to Manchester Coach Station
17:30 - 22:12
Where I will pick you up and stay over at mine.
Tuesday 29th October
Caroline, Janine, Milena, Siobhan, Tomas
Bus shoot at Stagecoach Hyde Road
09:30-14:30
I'll drive us there, set up cameras.
3 actors arriving at 10:00 then these will leave with another set of 3 actors arriving.
I'll then drop you off at the train station, 5 minute drive.
Caroline, Milena, Siobhan, Tomas
Manchester Piccadilly Train Station to London Euston
14:55 - 17:04
You will then shoot on the streets of London at sunset.
When it's dark, we film on the locations on the route me and Milena drew on the map.
Caroline is staying in London
Siobhan has a train ticket so is making her way back with that. (The closest in time to the coach is 23:05-01:52 from Waterloo but this requires a change in Southampton Central... so maybe the 22:35-00:21 from Waterloo which require no changes.)
Milena, Tomas
London Victoria Coach Station to Bournemouth Coach Station
23:30 - 01:40
Wednesday 30th October
Return equipment before 4/5pm
I'll be returning on November the 3rd at the latest and return the rest of the equipment by Monday.
Production blog for the short film OFF PEAK, a major project at Bournemouth University.
Showing posts with label schedule. Show all posts
Showing posts with label schedule. Show all posts
Wednesday, October 9, 2013
Monday, September 30, 2013
Bus Filming
So we have a permanent record:
The bus company have confirmed Tuesday the 29th of October for us to film there.
It'll be a double decker bus, company Stagecoach.
We are only allowed to film inside the bus, which will be cordoned off outside in the rear yard at the Hyde Road Depot.
I need to double check the timings as he said something contradicting himself so I'll get back to you on that but it would approximately be 9/10-2:30. But they may be lenient with this with it being in the holidays.
But this means Milena can now confirm the London Underground shoot around this and then we'll be able to arrange transport.
The bus company have confirmed Tuesday the 29th of October for us to film there.
It'll be a double decker bus, company Stagecoach.
We are only allowed to film inside the bus, which will be cordoned off outside in the rear yard at the Hyde Road Depot.
I need to double check the timings as he said something contradicting himself so I'll get back to you on that but it would approximately be 9/10-2:30. But they may be lenient with this with it being in the holidays.
But this means Milena can now confirm the London Underground shoot around this and then we'll be able to arrange transport.
Thursday, August 1, 2013
Upcoming Tasks in Broad Strokes
Important Things To Be Completed in the first few months:
AUGUST:
General stuff laid out so detail & concrete planning can start:
16-17th September: Night time location scouting for London exteriors
AUGUST:
General stuff laid out so detail & concrete planning can start:
Bus found- Story outlined (main scenes selected & beats determined)
Monster designs chosen
Ongoing: previs, modeling/programming/rigging practice
SEPTEMBER:
Final preprod work done based on decisions made in August:
- Sofware choises made, pipeline outlined
- Tools required to start work
- Final character designs
- Final script
As everyone returns to Bournemouth:
4. Storyboards
5. Colour script
OCTOBER:
Shift from preproduction to production, start of modeling/rigging. Also important:
- Animatic (-> composer contact)
- Project pitches / showreels
--
LIVE ACTION SHOOT:
Exact date in November (once the pitch has been accepted) to be decided. It will probably go something like this:
Day 1:
Train to London.
Underground shoot.
Train to Bedford.
Day 2:
Bus shoot 1.
10-11: Camera/actor/monster placements determined, measurements made, set dressed (posters)
11-13.30: Actors arrive, filming.
13.30-14:00: Cleanup.
Cake.
Check footage for problems.
Day 3:
Bus shoot 2.
10:00-10:30: Setup.
10:30-13.30: Filming. (If Horny is SFX, this is the filming day for his scenes.)
13:30-14:00 Cleanup.
Cake.
Train to London.
After sundown: London exteriors shoot.
Train to Bournemouth.
--
As the preproduction gets done and stuff clears up, the rest of the schedule will slot into place.